Gateway Marina

Category: Marinas

Location: Hypoluxo, FL
Size: 30,000 sf
Contract Method: Design / Build

One- story with 3 level dry stack storage system.

100’W x 300’L x 38’2” eave height and 2 on 12 roof slope

30’ x 30’ rolling doors located at each end.

 

Gateway was built in two phases. The Marina took in dry docked boats and moved them to the west side. Ahrens Companies then built the east side of the Marina. Once the east side was completed, Gateway moved the boats to the east side and Ahrens proceeded to build the west side of the building, including the two rolling doors on both ends. The work was all done while the Marina stayed operational.